you should have a flexible pipe (grey) leading to the expansion tank in the boiler casing, there should be a thumb turn valve on one end of it. Open the valve and water should re-pressurise the system, let it fill till about 1 bar on the gauge. When youv'e bled rads re-top pressure up again. hope this helps
pete, July 2008