Removing rkp from the fabric of the building.
Altering wiring as required.
Repositioning/fixing rpk in desired location and rewiring.
Powering system back up battery first closing end station,then mains.
Resetting the system to clear the mains fail and tamper possibly using ENG code.
If I think of owt else I let u know.
e manno, February 2014