near to your boiler there should be a filling loop. This is a pipe, usually flexible, with an inline shutoff valve that you open with a flat screwdriver. Open this valve slowly until the guage on your boiler moves to between 1 and 2 bar pressure. close the shutoff valve tight. You have to do this every time you bleed system.
Tony T, December 2008