you use the 2 filler taps located under the boiler they should be connected together via a braided pipe (filler loop) gently open both taps and watch either the gauge or the display reading, watch the pressure rise as it gets close to 1.5 MAX cold get ready and turn off both taps
wirecutterman, December 2010