do you have a test meter ??if not get a pro in what peccavi is saying you have a loop in loop out system if you have a test meter then turn power off take all wires out of the rose,connect your meter to one pair of wires,get some one to turn the switch on and off,do this with all wires,when you find the wires that go open circuit when you turn the switch on and off these are the switch wires,now connect one side of the switch wire to the flexi cable the wire that goes to your bulb connection,and put the other to the centre connection of your rose then put the remaing red wires to the centre connection,put the black wires to the neutral side of your flexi cable
mm, July 2013