Im a gas engineer and have replaced many of these before you have 3 nuts on the back and 1 screw on the right securing a clip in place isolate the cold mains coming in and the flow and return valves drain water from boiler drain point and re assemble in reverse order fairly simple should take about 30-40 minutes
Daniel, April 2008